IBT PORT INFORMATION
Vessel to be Anchorage for loading with
position :
Position : Lat. 04 – 00 - 00 S / Long. 116
– 00 - 00 E
Terminal
Position : Lat. 04 – 02
- 00 S / Long. 116 – 00 - 00 E
Owner : PT. PELINDO IV
Shipper :
- PT. Garda Tujuh Buana
- PT. Adani Global
Working
Hours : 24 Hours / 7 Days a week
(except for National Holidays)
Water
Density : Approx. 1018 up to 1020
Stowage
Factor : About 41.0 – 43.0 Cuft /Mt
Max Air Draft
|
: 17,5 mtrs
|
LOA
|
: 230 mtrs
|
Beam
|
: 43 mtrs
|
Loading Facilities :
Largest
Capacity : 270 – 300 ft
Loading rate :
§ By Floating
crane : 10,000 MT/day/Floating crane
§
By Ship crane
:
8,000 MT/day
- Loading jetty designed with two fixed fluffing / slewing ships loaders.
- Only one ships loader is used for loading at one time due to the loading system design.
- Usually the holds from after part are loaded by ships loader no. 1 and the holds from forepart are loaded by ships loader no. 2.
- Ships loader outreach from fender face is 15 M (max air draft 17,5 MTRS )
- Distance between the two fixed ships loader is 72 M
- In approaching the anchorage please contact the port office on this frequency : VHF channel 12 SSB 9.343 KHZ ( IBT Port Control ).
- Please confirm to arrive your ship with all ballast tanks full. Also the ship’s trim at the berthing time should not exceed 2.5 M by the stern.
- The conditions are needed by IBT operators in order to have a safe slewing of the ships loaders boom above the hatch coming.
§ Bunker and fresh water
supply facilities not available, supply provision available if required please
fax to your local agent your provision
list enable to relay and get their quotation asap.
§ PT. Adaro Indonesia
cargo stowage factor : 42.5 CUFT per metric ton
- During loading the vessel must be shifted alongside jetty for the hatch changes
-
One ships loader can reach only two hatches when is
positioned between two hatches.
-
Experienced
from previous shipment required
about 34 hours to load cargo about 66,000 MT
-
To minimize the number of shifting to three it is
suggested the following loading arrangement for a standard Panamax bulk carrier
with seven hatches.
-
1st Arrangements or second Arrangements
1. No. 5 1. No. 2
2. No. 3 2. No. 3
3. No. 6 3. No. 5
4. No. 2 Shifting 4. No. 6 Shifting
5. No. 1 5. No. 7
6. No. 4 6. No. 4
7. No. 1 Full
Shifting 7. No. 7 Full
Shifting
8. No. 7 8. No. 1
9. No. 4 Full 9. No. 4 Full
10. No. 7 Full Shifting 10. No. 1 Full Shifting
11. No. 5 Full 11.
No. 3 Full
12. No. 2 Full Shifting 12.
No. 6 Full Shifting
13. No. 6 13.
No. 2
14. No. 3 14.
No. 5
Stop loading
draft check & Trimming Stop
loading draft check & Trimming
15. No. 6 Full 15.
No.2 Full
16. No. 3 Full 16. No.5 Full
Usually when
the vessel is berthed, the first position will have ships loader no. 1 between
hatch #5 and hatch #6 and ships loader no. 2 between hatch #2 and hatch #3, for
first run by normally total load approximate 50 %.
Please advice
by return which arrangements will be used.
Note : Additional vessel shifting while loading activity as Master request over than
normal IBT standard will
be charged by terminal.
For the Super Panamax content of 5 cargo holds, loading
Sequence will asf;
1 st
Arrangement
§ No . 2 , 4 ,
1 ( 50 % ) shift
§ No . 3 , 5 , 3
, 5 ( 100 % ) shift
§ No. 1 ( 100 % )
shift
§ No. 2 , 4 ( 100 % ) include final trimming
2 nd
Arrangement ;
§ No. 1 , 3
( 50 % ) shift
§ No. 2 , 4 ,
2 , 4 ( 100 % ) shift
§ No. 5 ( 100 % )
shift
§ No. 1 , 3
( 100 % ) include final trimming
For Handy
Sizes Vessel ( 45,000 DWT )
loading Sequence will asf ;
1st
Arrangement ;
§ No. 1 , 2
, 4
( 50 % ) shift
§ No. 3 , 5 , 3 , 5 ( 100 % ) shift
§ No. 1 , 2
, 4
( No. 2 full )
shift
§ No. 1 , 4 ( 100 % )
include final trimming.
2
nd Arrangement ;
§ 2 , 3 , 5 ( 50 % )
shift
§ 1 , 4 , 1 , 4
( 100 % ) shift
§ 2 , 3 , 5 (
No.3 full ) shift
§ 2 , 5 ( 100 % ) include final trimming
For our prior preparation please
advise asf :
§
Vessel’s 7/5/3/2/1 ETA Notice including load port
local time
§
Last port of call with departure time
§
Vessels update crew list when available
§
SMC, DOC, deratting n tonnage certificate
§
Whether all ship’s certificate still valid until
completion of loading
§
Pre s/plan bss on shipper cargo s/factor 42.5 CUFT
per MT
§
Provision list if any
Operation In Charge:
1. MR.
Keith James, position Senior Operation Manager
- Direct Call : 0518 - 38827
- Phone : 62-518 - 38800 ,
- Fax : 62 – 518 – 38822 ,
- e-mail : kjames@ibt.co.id
2. Gatot R , position
Senior Operation Executive
- Direct Call : 0518 - 38806
- Phone : 62-518 - 38800 ,
- Fax : 62 – 518 – 38822 ,
- e-mail : gatot@ibt.co.id