Showing posts with label Shipping. Show all posts
Showing posts with label Shipping. Show all posts

Thursday, October 17, 2013

SAMARINDA PORT INFORMATION

Vessel to be Anchorage for loading with position :

MUARA JAWA


Seasonal Period for Anchorage From January - July


Loading Anchorage Position :

  • : Lat 00-59-30 S / Long 117-17-00 E (Handy)
  • : Lat 01-02-01 S / Long 117-14-00 E (Panamax)
Muara Jawa Anchorage : 
  • : Lat. 01'-08.30 S / Long. 117'-11.00 E
  • : Lat. 01'-12.00 S / Long. 117'-18.30 E
Pilot boarding ground : 
  • : Lat 01-13-00 S / Long 117-14-00 E
(Please keep contact VHF CH.12 / CH.73 on vsl approaching)

Open Sea Area : Distance From Samarinda By Full Cargo On Barges Is 12 – 14 Hours Open Sea Area


Pilot Compulsory with VHF CH. 12


Distance from Samarinda by Full Cargo on Barges Is 12 - 14 Hours



MUARA BERAU

Seasonal Period For Anchorage From July – December


Loading Anchorage Position

  • : Lat 00-15-00 S / Long 117-33-00 E (Handy)
  • : Lat 00-14-06 S / Long 117-35-18 E (Panamax)
Muara Jawa Anchorage : 
  • Lat. 00 - 28’-00 S / Long. 117-45’-00 E
  • Lat. 00 - 10’- 00 S / Long. 117-45’-00 E
  • Lat. 00-20’-30 S / Long. 117-38’-15 E

(Please keep contact VHF CH.12 / CH.73 on vessel approaching)


Open Sea : Distance from Samarinda by Full Cargo On Barges Is 24 - 26 Hours


OTHER INFORMATION


Local Time : GMT + 8 HOURS (18:00 GMT = 02:00)


Weather Condition : Temperature Min 24 - Max 32°C, Humidity Min 67% Max 95%


Working Hours : 24 Hours/day, 7 days/ week shinc, ex. National Major Holiday



Panamax Or Cape Size Ships Gear/Gearless Acceptable

Water Density 1.019 - 1.021 Kg/lt
  • Loading Rate By Ships Gear (Grab) Abt. 9,000 MT - 12,000 MT All Running Well
  • Loading Rate By Shipper Gear (Grab) Abt. 4,000 MT - 6,000 MT All Running Well
  • Calculation loading by Draft Survey Method - Weather Condition : Moderate Sea - Depth Water 25 M - 40 M
  • International airport from Balikpapan And to Samarinda around 2,5 hour by car

MUARA SATUI PORT INFORMATION



Vessel to be Anchorage for loading with position:

Position                                                                 : Lat. 03’ – 58.0 S  / Long. 115’ – 31.0 E
Depth                                                                     :

            • +/- 14.00 Mtrs (Low tide)
            • +/- 16 meters (High tide)

                                                                           
Density Sea Water at Loading Port                  : From 1.018 Up To 1.021
Description of Cargo                                          : Coal
Working Hours                                                    : 24 Hours / 7 Days (except for Big Holiday or religious festival)                        
Water Density                                                      : Approx. 1018 up to 1021


Method of Loading Operation                          :

Caused vessel will be have loading operation at anchorage and shipper must be arrange the labour as operators crane for discharge cargo from barge to vessel.

So for the loading operation they will be used ship’s crane.  But for the example if at vessel didn’t have cranes same like as panamax vessel or cape size the shipper will be arrange shore’s crane (Floating Crane|) for loading operation and also same like as for Grabs Bucket.

But sometimes the shipper like used shore’s grab for loading operation caused they want to take about loading rate/days and than at vessel also have grab’s bucket on board but not used. (Depend with charter party between parties concerned) / Barge will be aside at vessel P/S & S/S (2 side if fine weather).

Loading Rate at anchorage                                                :

            • +/- 8,000 mt up to +/- 10,000 mt per days (GEARED)
            • +/- 10,000 mt up to +/- 15,000 mt per days (GEARLESS)

Main shipper                                                        :
            • PT Wahana Baratama Mining
            • PT Borneo Indo Bara
            • PT Bumi Dharma Kencana

Note       :

If Shipper  PT Wahana Baratama Mining Loading will use KFT ( Kalimantan Floating Transfer ) with loading rate :  25,000 – 30,000 mt/day.

Monday, October 14, 2013

Muara Pantai Port Information

Vessel to be Anchorage for loading with position:

Geographical position                                        : Lat. 02-09-30 N / Long. 117-29-00 E
Standard time                                                       : UTC +8 hours
Navigation Chart                                                 : Indonesia chart no. 254

Compulsory                                                        :

Wednesday, September 25, 2013

Adang bay Port Information




ADANG BAY PORT INFORMATION


Vessel to be anchorage for loading with position :
 
01 - 42 - 00 S  /  116 - 38 - 00 E
01 - 42 - 30 S  /  116 - 38 - 00 E 
01 - 43 - 00 S  /  116 - 38 - 00 E
01 - 43 - 30 S  /  116 - 38 - 00 E   

 The above position with Depth more than 16 M (FOR PANAMAX VESSEL)

01 - 42 - 00 S  /  116 - 38 - 30 E
01 - 42 - 30 S  /  116 - 38 - 30 E
01 - 43 - 00 S  /  116 - 38 - 30 E
01 - 43 - 30 S  /  116 - 38 - 30 E

The above position with Depth more than 22 M (FOR CAPE SIZE VESSEL)

Pilotage (Compulsory)
§  Cargo Stowage Factor
§  Beam
:
: ABT 43 - 45 CUF/MT WOG
: Max 45 m, Air Draft : Max 17.5 m

No other restriction at anchorage loading position. 
Please inform Master to contact VHF channel 14/16

Loading Procedure
:
  • By Barges, Ship' Crane with Grab (GEARED VESSEL)
Loading by Ship’s Crane max 4 Gangs

  • By Shipper Floating Crane (GEARLESS VESSEL)

-          FLF ORBITA
: 25,000 MT/Daily (Air draft 16.0 M)
-          FC Borneo Indah
: 25,000 MT/Daily (Air draft 16.0 M)
-          FC Borneo Damai
-          FC OBT 1
-          FC DAY SPRING          
: 20,000 MT/Daily (Air draft 17.0 M)
: 10,000 MT/Daily (Air draft 16.0 M)
: 10,000 MT – 16,000/Daily (Air draft 16.0 M)









Loading by Floating Crane
: 2 Gang

Barges schedule usually we could got information from Shipper
2 days before vessel arrive.

Port Security Level            
: Level  1
PFSO Name          
: MR FAHMI AGUS RAMADHANI (62-813-466-30700)



IBT Port Information



IBT PORT INFORMATION


Vessel to be Anchorage for loading with position :

Position                                                               : Lat. 04 – 00 - 00 S / Long. 116 – 00 - 00 E
Terminal Position                                               : Lat. 04 – 02 - 00 S / Long.  116 – 00 - 00 E
Owner                                                                  : PT. PELINDO IV
Shipper                                                                :
                  • PT. Garda Tujuh Buana
                  • PT. Adani Global

Working Hours                                          : 24 Hours / 7 Days a week (except for National Holidays)
Water Density                                            : Approx. 1018 up to 1020
Stowage Factor                                                    : About 41.0 – 43.0 Cuft /Mt

Max  Air Draft 
: 17,5 mtrs
LOA
: 230  mtrs
Beam
: 43   mtrs


Loading Facilities                                             :

Largest Capacity                                                  : 270 – 300 ft
Loading rate                                                         :
§  By Floating crane    : 10,000 MT/day/Floating crane
§  By Ship crane           :   8,000 MT/day

  • Loading jetty designed with two fixed fluffing / slewing ships loaders.

  • Only one ships loader is used for loading at one time due to the loading system design.

  • Usually the holds from after part are loaded by ships loader no. 1 and the holds from forepart are loaded by ships loader no. 2.

  • Ships loader  outreach  from fender face is 15 M (max air draft 17,5 MTRS )
  • Distance between the two fixed ships loader is 72 M

  • In  approaching  the  anchorage  please  contact  the port office on this frequency : VHF channel 12 SSB 9.343 KHZ  (  IBT Port Control ).

  • Please confirm to arrive your ship with all ballast tanks full. Also the ship’s trim at the berthing time should not exceed 2.5 M by the stern.

  • The conditions are needed by IBT operators in order to have a safe slewing of the ships loaders boom above the hatch coming.

§  Bunker and fresh water supply facilities not available, supply provision available if required please fax to your local agent  your provision list enable to relay and get their quotation asap.

§  PT. Adaro Indonesia cargo stowage factor : 42.5 CUFT per metric ton


  • During loading the vessel must be shifted alongside jetty for the hatch changes

-          One ships loader can reach only two hatches when is positioned between two hatches.
-          Experienced  from  previous shipment required about 34 hours to load cargo about 66,000 MT
-          To minimize the number of shifting to three it is suggested the following loading arrangement for a standard Panamax bulk carrier with seven hatches.
-          1st Arrangements or second Arrangements


1.   No. 5                                                                         1.   No. 2
2.   No. 3                                                                         2.   No. 3
3.   No. 6                                                                         3.   No. 5
4.   No. 2         Shifting                                                  4.   No. 6                Shifting
5.   No. 1                                                                         5.   No. 7
6.   No. 4                                                                         6.   No. 4               
7.   No. 1         Full Shifting                                          7.   No. 7                Full Shifting
8.   No. 7                                                                         8.   No. 1                               
9.   No. 4         Full                                                         9.   No. 4                Full
10. No. 7         Full Shifting                                          10. No. 1                Full Shifting
11. No. 5         Full                                                         11. No. 3                Full
12. No. 2         Full Shifting                                          12. No. 6                Full Shifting
13. No. 6                                                                         13. No. 2
14. No. 3                                                                         14. No. 5
        
Stop loading draft check & Trimming     Stop loading draft check  & Trimming

15. No. 6         Full                                                         15. No.2 Full
16. No. 3         Full                                                         16. No.5 Full

Usually when the vessel is berthed, the first position will have ships loader no. 1 between hatch #5 and hatch #6 and ships loader no. 2 between hatch #2 and hatch #3, for first run by normally total load approximate 50 %.

Please advice by return which arrangements will be used.
Note :  Additional vessel shifting  while loading activity  as Master request  over than  normal   IBT standard  will  be charged  by  terminal.

For the Super Panamax content of 5 cargo holds, loading Sequence will asf;

1 st  Arrangement

§  No . 2 , 4 , 1   ( 50 % )  shift
§  No . 3 , 5 , 3 , 5  ( 100 % )  shift
§  No.  1 ( 100 % )  shift
§  No. 2 , 4  ( 100 % ) include  final trimming

2 nd  Arrangement ;

§  No.  1 , 3  ( 50 % )  shift
§  No.  2 , 4 ,  2 , 4 ( 100 % )  shift
§  No.  5 ( 100 % )  shift
§  No.  1 , 3  ( 100 % ) include  final  trimming

For  Handy  Sizes Vessel  ( 45,000 DWT ) loading Sequence will asf ;

1st Arrangement ;

§  No. 1 , 2 ,  4  (  50 % ) shift
§  No.  3 , 5 , 3 , 5 ( 100 % )  shift
§  No. 1 , 2 ,  4  (   No. 2  full  ) shift
§  No. 1 , 4  ( 100 % )  include final trimming.

2 nd Arrangement ;

§  2 , 3 , 5  ( 50 % )  shift
§  1 , 4  , 1 , 4  ( 100 % )   shift
§  2 , 3 , 5  (  No.3  full )  shift
§  2 , 5  ( 100 % ) include final trimming

For  our prior preparation please advise asf :

§  Vessel’s 7/5/3/2/1 ETA Notice including load port local time
§  Last port of call with departure time
§  Vessels update crew list when available
§  SMC, DOC, deratting n tonnage certificate
§  Whether all ship’s certificate still valid until completion of loading
§  Pre s/plan bss on shipper cargo s/factor 42.5 CUFT per MT
§  Provision list if any

Operation In Charge:

1.  MR.  Keith James,   position Senior Operation Manager

  • Direct Call             : 0518 - 38827
  • Phone                     : 62-518 - 38800 ,
  • Fax                          : 62 – 518 – 38822 ,
  • e-mail                    : kjames@ibt.co.id

2. Gatot R  , position  Senior Operation Executive

  • Direct Call             : 0518 - 38806
  • Phone                     : 62-518 - 38800 ,
  • Fax                          : 62 – 518 – 38822 ,
  • e-mail                    : gatot@ibt.co.id